Structure & inspection
Insert inspection scope and quality documentation
Incoming inserts, STI receiving threads, installed position and locking function are different inspection objects. Drawings and agreed requirements define methods, gauges and records.
Scope: Inspection planning and troubleshooting for wire inserts. Drawings and applicable specifications define limits, sampling and equipment.

Inspect at the relevant stage
| Stage | Check |
|---|---|
| Incoming | Identity, material, finish, appearance and specified dimensions, using a defined method for the elastic free-state part. |
| After drilling | Diameter, depth, position, entry and cleanliness. |
| After tapping and treatment | STI thread, required minor-diameter checks and full thread depth. |
| After installation | Position, integrity, tang recovery, foreign material and agreed functional checks. |
| Screw-locking function | Specified screw, lubrication, cycles and torque measurement conditions. |
Identify what the gauge measures
An STI receiving thread and the finished screw thread are different inspection objects. Similar size labels do not make their gauges interchangeable.
The image shows an M8×1.25-6H standard thread gauge and an ST8×1.25-5H receiving-thread gauge. The STI gauge checks the tapped receiving thread; bore diameter, minor diameter and depth require their corresponding inspection tools.
Follow customer requirements for final free-running thread inspection. Use the specified functional method for a locking insert rather than forcing a standard gauge through its locking section.
Keep three torque measurements separate
Insert installation torque, prevailing torque through the locking section and joint tightening torque describe different operations. Record the stage, units and method.
Differences in screw hardness, finish, lubrication or dimensions can change results. A specified test does not replace validation of the actual assembly.
Common questions
Does a failed GO check always mean a defective insert?
First identify free-running versus locking function, the gauge and the agreed acceptance method, then investigate the hole, seating and damage.
Does full inspection establish all performance?
A result covers only its specified checks and scope. Visual inspection does not establish material chemistry or joint performance.
Citation and scope
ZCOIL. Insert inspection scope and quality documentation. 2026-10-30. https://www.zcoiltech.com/en/technical/inspection-before-and-after
Prepared by ZCOIL for product selection and technical discussion. Applicable drawings and confirmed documents define dimensions, processes and acceptance requirements.


